Planning · 6 min · 2026-07-22
Planning a shade project
Photo, ZIP installer, financing, lead times, freight and what to send with a quote.
Order of operations
1) ZIP search for an installer. 2) Guided questions on the category page. 3) Configurator (imperial default). 4) Financing calculator if needed. 5) Quote or cart. Production weeks and freight days show in the cart after you enter a ZIP.
Questions people ask
- What should I upload?
- A photo of the house or building is required on every configurator before add-to-cart. Drawings (floorplans, elevations, BIM) are optional checkboxes on the pergola builder.
